What this inverter size calculator does
Most sizing advice stops at “add up the watts and buy something bigger”. That number is usually wrong in four places: it ignores start-up surge, it ignores the DC side, it ignores cable loss, and it says nothing about what the battery has to deliver. This tool walks all five steps and shows the working.
Nothing is uploaded. The calculation runs in your browser, so you can try five different load lists without sending anything to a server.
Step 1 — list what you want to run
Tap a typical load to add it, then set the quantity. The watts shown are typical running figures, not nameplate marketing numbers; for anything expensive, read the label on the appliance instead. The Start column is the multiplier the load pulls for a fraction of a second when it starts: resistive loads like a heater or an incandescent lamp sit at 1x, motors and compressors are typically 3x to 4x, and a well pump can be higher.
Two loads are already filled in as an example: a 15 cu ft fridge and eight LED lamps.
Step 2 — set your system
Battery voltage, power factor, inverter efficiency, cable length, maximum voltage drop and backup hours. If you do not know the power factor, 0.8 is the honest default for a mixed household load with motors in it, and 1.0 is only right for pure resistive loads or equipment with power factor correction.
Step 3 — read the result
Seven numbers come back, and they answer different questions. The next sections explain each one, so you can tell which of them is the one that will actually change your buying decision.
The numbers, and what each one is for
Recommended inverter size. Your continuous load, plus 25% headroom, rounded up to a standard size. The headroom is not padding for luck: inverters are most efficient and coolest below their rating, and a unit running at 100% for hours will derate or shut down on a hot day.
Surge it must survive. The sum of each load's running watts times its start multiplier. This is a deliberately conservative figure — in reality loads rarely start at the same instant — but it tells you what surge rating to look for in the datasheet. If your surge exceeds the recommended continuous size, either buy a unit with a surge rating that high, or stagger the motor starts.
Battery bank voltage. Below roughly 1,500 W, 12 V is normal; between 1,500 W and 3,000 W, 24 V; above 3,000 W, 48 V. This is not a preference. It is set by current: the same wattage at 12 V pulls four times the amps it does at 48 V, and the cables, fuses and terminals have to carry that.
DC current, fuse and cable. DC current is watts divided by battery volts, divided again by inverter efficiency — a 3,000 W inverter on a 48 V bank at 90% efficiency draws about 69 A, not 62.5 A. The fuse is 125% of that current, which is the usual code-driven rule for continuous loads. The cable gauge is the thinnest copper conductor that keeps voltage drop under your chosen limit over the round trip (both directions).
Battery bank size. If you enter backup hours, you get the amp-hours needed at your system voltage, assuming 80% usable depth of discharge and the same inverter efficiency. Lead-acid banks should not be run flat, and lithium is usually quoted at 80–90% usable, so this is the number to compare against datasheets.
A worked example
A fridge (150 W, 3x start), eight LED lamps (10 W each), a laptop (65 W) and a microwave (1,000 W, 1.5x):
- Continuous load: 150 + 80 + 65 + 1,000 = 1,295 W
- With 25% headroom: 1,619 W, so the recommended size is 2,000 W
- Surge: (150 × 3) + 80 + 65 + (1,000 × 1.5) = 2,095 W
- At 48 V and 90% efficiency, DC current at rated output: 2,000 ÷ (48 × 0.9) = 46 A, so a 60 A fuse
- A 10 ft one-way run with a 3% drop limit: 10 AWG copper. 12 AWG would drop about 1.8 V and be over the limit
- Four hours of backup at the continuous load: about 150 Ah at 48 V
Notice that two of those numbers (2,095 W surge and 150 Ah) are things a plain “add the watts” calculation never shows you, and both of them change what you buy.
Five mistakes this catches
- Sizing on running watts only. A 1 HP well pump runs at about 750 W and starts at roughly 3,000 W. An inverter sized on 750 W trips on every start.
- Running 3,000 W at 12 V. That is around 278 A before efficiency. It is why 48 V is the standard above 3 kW, and why 12 V high-power inverters are mostly for vehicles.
- Ignoring power factor. A 1,000 W load at 0.8 PF is 1.25 kVA. Inverters are sold in both watts and VA, and comparing the wrong pair of numbers is how people end up with an undersized unit.
- Skipping the cable calculation. Undersized DC cable wastes power as heat, trips the low-voltage cutoff under load, and is a fire risk. The calculator sizes it against your actual run length.
- Reading battery Ah as usable Ah. A 100 Ah lead-acid battery gives you about 50 Ah before you damage it; the calculator already applies 80% depth of discharge.
Choosing the battery voltage
| Continuous load | Typical bank voltage | DC current at 90% efficiency |
|---|---|---|
| Up to 1,500 W | 12 V | up to 139 A |
| 1,500–3,000 W | 24 V | 69–139 A |
| 3,000–10,000 W | 48 V | 69–231 A |
| Above 10,000 W | 48 V, often two units in parallel | 231 A and up |
If your existing battery bank is 24 V and the calculator says 48 V, you have three honest options: keep the loads below 3 kW, add a second 24 V bank and use a 24 V inverter, or move to 48 V. Fudging the voltage in the tool will not change what the cable has to carry.
When to size larger than the result
Add margin if you plan to run a welder, an air compressor or a table saw; if the inverter will sit in a hot shed or garage, because ratings are quoted at 25 °C; if you are buying for a growing off-grid cabin rather than a fixed load list; or if you want to run everything at once rather than manage loads. For more on matching inverter size to a house, the written sizing guide covers the same method step by step, and 48V systems explains why the current numbers matter so much above 3 kW.
These results are a sizing estimate, not a design. Final conductor sizing, overcurrent protection and disconnects have to follow the code that applies where you build — in the US that is NEC Article 690 and 706, and a licensed installer signs off on the rest.