Why the word "manufacturer" is not enough
In the inverter supply chain the same product can reach a buyer through a factory, a factory's export department, a trading company that buys from two factories, or an assembler that buys boards and housings. All four will describe themselves as a manufacturer. The difference shows up not in the catalogue but in the paperwork: who holds the test reports, who signs the warranty, and who answers when a container arrives with three dead units. This page is the checklist to settle that before money moves.
Six checks before the purchase order
1. Ask what they actually make
Ask for the production lines and the processes done in-house: SMT assembly, magnetics winding, sheet metal, final test. A supplier that outsources everything is a brand, not a factory, which is fine — as long as the price and the warranty reflect it.
2. Verify certificates, not logos
CE, UL 1741, TUV, IEC 62109, grid code certificates: each has a certificate number that can be looked up in the issuing body's database. Ask for the certificate PDF and the test report that matches the exact model, then check the model number field. A certificate issued for a 5 kW model does not cover the 8 kW model with the same housing.
3. Compare the datasheet with the test report
Peak efficiency, MPPT window and surge rating should appear in both documents and agree. Where they diverge, the test report wins.
4. Establish real lead time
Ask for the lead time of the specific model, in writing, with the battery pack or accessory if the order includes it. A quoted 25 days on a model the factory builds in batches of 500 means your 40-unit order waits for someone else's container.
5. Read the warranty terms, then the service address
A ten-year warranty means nothing without a repair location and a spare parts commitment. Ask where a faulty unit goes, who pays the freight, and whether the model will still be supported in five years. Export-only brands with no service point in your market are a different risk class from brands that stock spares locally.
6. Ask about firmware and grid codes
The same hardware ships with different firmware for different countries. Confirm that the units you receive carry the grid code certificate for your market, and ask how firmware updates are delivered — a USB port, a monitoring platform, or not at all.
What to send in an RFQ
A useful request takes one page:
- The model or the specification: kW, phase, battery voltage, MPPT window, backup output.
- Quantity for the first order and the annual estimate.
- Destination country and the grid code required there.
- Labelling and packaging requirements, plus the language of the manual.
- Any accessory in the box: CT clamps, Wi-Fi stick, parallel cables.
Quotes that arrive without a model number and a datasheet are not comparable, and comparing them on price alone is how projects end up with units that cannot be commissioned.
Comparing quotes
Line the offers up on four columns: unit price at the quoted quantity, certification for your market, warranty with a service address, and lead time in writing. The cheapest column is rarely the cheapest project. A difference of a few percent per unit disappears the first time a shipment needs replacement boards.
Common failure modes
- Certificates that cover a sibling model, not the one being shipped.
- Datasheet efficiency quoted at a load the unit will never see.
- Batteries sold with the inverter but not on the tested compatibility list.
- Manuals in a language the installer cannot read, discovered on site.
Each of these is avoidable with one email before the order, and expensive to fix afterwards.